N/A
In 2019 SAPPHIRE received a major 10-year refit, in 2020/2021 she received new engines and generators, and completed her 5-year special survey in 2024. A full list of the work is in the detailed specifications and available upon request.
SAPPHIRE can sleep up to 20 guests in 7 flexible staterooms. The Owners’ suite is located on the bridge deck facing aft with sliding glass doors onto the bridge deck aft. The suite features an ensuite with a large bathtub and a walk-in closet. One double cabin can be found on the bridge deck and the second can be found on the main deck. Below deck you will find two triple cabins, each with a queen and twin bed, and both with an ensuite featuring a tub. Further forward are two twin cabins, each with their own pullman berths and an ensuite bathroom with a shower.
There is ample outdoor space for entertaining, with a large dining table on the main deck, versatile seating and lounging on the bridge deck, and more seating on the Portuguese bridge--perfect for sun downers. The sun deck is expansive with a jacuzzi, bar area, lounging areas, and an al fresco dining area that is perfect for relaxing with friends and family.
SAPPHIRE boasts options for both indoor and outdoor dining, with an elegant dining table in the salon that seats up to 12 guests. The main salon also features a bar, comfortable seating with a hidden TV, and beautiful oversized windows for natural light. Forward of the salon is a recreational room, which is perfect as an entertainment space for kids that can easily be converted to a VIP cabin.
Exceptionally comfortable, SAPPHIRE is equipped with Quantum Zero-Speed stabilizers and features a pair of 3,650HP MTU engines that give her a top speed of 23 knots and a more economical cruising speed of 15 knots.
FULL SPECIFICATIONS
MAIN SPECIFICATiONS
MAIN SPECIFICATIONS
Length Overall: 50.5m (165'8")
Length at Waterline: 43.86m (143’11”)
Beam: 8.59m (28’2”)
Draft: 2.59m (8’6”)
Air Draft: 15.50m (50’10”)
Year Completed: 2009
Model Year: 2009
Refit: 2019 & 2020/21
Type: Custom Tri-deck Motor Yacht
HIN:TTY16554K910
Tonnage: 478
Net Tonnage: 143
Displacement: Semi-Displacement
Cabins: 7
Guests: 20
Crew: 12
CONSTRUCTION
Builder: Trinity Yachts LLC
Naval Architect: Trinity Yachts LLC
Exterior & Interior Design/Stylist: James McFarlane
Hull Material: Aluminum
Deck Material: Teak & Nonskid on Sun Deck
Classification: American Bureau of Shipping
SPEED
Maximum: 23 knots
Cruising: 15 knots
Economical: 12 knots
Range: 4,000nm
Consumption @ Cruising: 300L/pHr
CAPACITIES
Fuel: 58,761L (15,523.011g)
Water: 9,986L (2,638.022g)
Grey Water:6,101L (1,612g)
Black Water: 1,597L (422g)
Lube Oil Capacity:2,294L (606g)
Waste Oil Capacity: 1000L (265g)
CLASSIFICATION & CERTIFICATIONS
Flag: Marshall Islands
ISM: N/A
Classification: American Bureau of Shipping
ISPS: N/A
MACHINERY
MAIN ENGINES
Engine Type: 2 x MTU 16V 4000 M90
Horsepower: 3650
Engine Serial Numbers: 527 104 598 & 527 104 599
Main Engine Hours (Port): 1790 (as of 10/2/24)
Main Engine Hours (Stbd): 1787 (as of 10/2/24)
*At the time of zero hour overhaul, ME:
Port - 9003 hrs
STBD - 9500 hrs
* MTU-Go is installed, so MTU can monitor remotely
GENERATORS & ELECTRICITY
Output: 290 KW
Generators: 2 x Northern Lights 145 kW@1800rpm Model M1066A2 120/208-3-60
Generator Fuel Consumption: 23L/pHr
Port Generator Hours: 6343 (as of 10/2/24)
Starboard Generator Hours: 6161 (as of 10/2/24)
Shore power: ASEA AC75LC-3
BATTERIES
Generator Starting: (2) 2 x 12-volt AGM Full River FT1450-8D 225AH
Emergency: 2 x 12-volt Lead Acid Northstar NSB 190FT BLUE+ 180AH
PROPULSION & STEERING
Gearboxes for Main Engines: ZF - 7640
Stabilizer: Quantum Marine QC-1800 Zero Speed q/ ARC -3001 MK2 Controller
Stabilizer Underway: Yes
Stabilizer at Anchor: Yes
Steering System: Engine Monitoring Inc. Model DE03 Dual x 3HP HPU FFU
OTHER MACHINERY
Water Makers: 2 x FCI - NM55263+APC
Water Softeners: 1 x HEM K50
Bow Thruster: Quantum Marine QT-150 150-hp
Fuel Separator and Filtration: Alfa Laval MAB 104 B 14/42
Sewage System: HeadHunter TW-300B
Fresh Water System:
- Pumps: 2 x Grundfos 30 SQE-130 MODEL- B/E P2 1737
- Treatment: Silver Sterilizer - Brannstrom Silster 168
UV - Atlantic Ultraviolet Corp. Model No. S2400C
Oily Water Separator: Recovered Energy Inc. - Boss 2.2T/107
Air Compressor: Jenny Products Inc. Model G
Air Conditioning: 5 x Marine Air Makeup Air Units, Panasonic Exhaust Blowers
Chillers: H&H
COMMUNICATION & NAVIGATIONAL EQUIPMENT
PILOTHOUSE
SAT COM: Tracphone 252 + KVH FB500 + Thuraya FDU 3500
Telephone System: Panasonic PBX KX-TDA200
SSB: Furuno FS1570 w/ Coupler
VHF: 2 x FURUNO FM -8800
MF/HF: FURUNO/ FS 1570
Iridium: Thales VesseLINK
Navtex: FURUNO / NX-700B
Enhanced Group Call: FURUNO / FELCOME-15
NAVIGATION SYSTEMS
Radar: 2 x X-Band Radars Furuno / FAR-28-7 Series
Gyrocompass:C-Plath Navigat X MK2
Magnetic Compass: Ritchie Powerdamp
Auto Pilot: C-Plath Navipilot 4000
Depth Sounder: Furuno Instrumentation w/7 RD30 Displays
GPS: FURUNO / GP-170
AIS:FURUNO / FA 150
Ships Computer: Email Server Comp. – VEI E-Server & Router
Laser Plotter: Raymarine
Wind/Speed Log: Furuno Instrumentation w/7 RD30 Displays
ENTERTAINMENT SYSTEMS
VSAT: Seatel 4004
TVRO: Seatel 4004
iPads: Crestron
GALLEY & LAUNDRY EQUIPMENT
MAIN GALLEY EQUIPMENT
Cooktop: Gaggenau Vario Flex Induction 400 Series
Oven: 2 x Gaggenau HLEB38(8)
Refrigerator: 1 x Cospolich Walk in Fridge
Freezer: 1 x Cospolich Walk in Freezer
Additional Refrigerator: Delfield GAR1NP-S-IV
Additional Freezer: Delfield GAF1P-S-I18
Dishwasher: Hobart LXEC
CREW GALLEY/ MESS
Fridge: Marvel ML24RAS2LS
Microwave: KictchenAid KBMS1454SSS-1
Dishwasher: Miele - GG07
LAUNDRY
Washing Machines: 2 x Miele - PW6068
Dryers: 2 x Miele - PT7138DECK EQUIPMENT
Anchor Windlass: 2 x Muir VRC-11000 Hydraulic w/ handheld Pendants
Aft Warping Capstans: 2x Muir VRC-4000 w/ footswitch
Anchors: 2 x HHP “Talon HP” nchors
Anchor Chain: 2 x 165m
Boat Crane and Davits:
Sundeck Crane: Nautical Structures EZ-5000-EX-204 258w/Freefall MCA
Foredeck Crane: Nautical Structures Eur1300-1700-MCA Compliant w/DC Emergency Power
Passarelle: Marquit Hydraulic 23.7ft Telescopic 8-Function Passarelle w/RF Control
SECURITY, FIREFIGHTING, AND SAFETY EQUIPMENT
SECURITY
CCTV System: Seven Cameras + Bosch MR16 DVR
Monitors: Servowatch System
FIRE FIGHTING EQUIPMENT
Fire Control System: Consilium Fire Detection System
Fire Extinguishers: 26 x 4.5 kg Dry Powder, 1 x 1 kg Dry Powder, 2 x 2kg Dry Powder, 1 x 6kg Dry Powder, 6 x 9kg Dry Powder, 2 x 5kg CO2, 5 x 9Ltr Foam
Fireman Suits: 2 x setups
Alarms: Servowatch System
Fire Pumps: Main Fire Pump in Engine Room, General Service pump in Engine Room, Emergency Fire pump in Steering Gear Compartment
CO2 System: Fixed CO2 system in Engine Room
SAFETY EQUIPMENT
Life Rafts: 4 x 25 person RFD Surviva Mk IV TO inflatable Life-raft
Life Rings: 4 x lifebuoys
EPIRBS: 2 x ACR / RLB, S/N 10134
Lifejackets: 43 x Adult Life Jackets, 9 x Child Lifejackets, 14 x inflatable lifejackets
Immersion Suits: 14 x Immersion Suits
Flares: 6 x Red Parachute Rocket Flares, 6 x handheld flares, 2 x smoke floating signal flares
Line Throwers: 2 x Line Throwers
Medical Equipment: Medaire – Category A Pack
SART: 2 x JOTRON / TRON SART-20, 9 Ghz, S/N 49149 & 49150ACCOMODATION AND LAYOUT
Guests:
Port Fwd: 3 Pax (Twins or King (Convertible) plus pullman)
Starboard Fwd: 3 Pax (Twins or King (Convertible) plus pullman)
Port Aft: 4 Pax (King and single plus pullman)
Starboard Aft: 3 Pax (King and Single)
Bridge Deck: 2 Pax (Double)
Master: 2 Pax (King)
Main deck: 3 Pax (Queen plus pullman)
Total: 20 Guests
Crew:
Captain: 1-2 Pax (Double bed)
Main Deck STB: 2 Pax (Bunk beds)
Lower Deck Port: 2 Pax (Bunk beds)
Lower Deck Stb Aft: 2 Pax (Bunk beds)
Lower Deck Stb Fwd: 2 Pax (Bunk beds)
Engineer Cabin: 1-2 Pax (Pullman Bed)
Engineer Cabin: 1 Pax
Total: 11-13 Crew
REFITS & WORKS COMPLETED
REFITS & WORKS COMPLETED
2019
Deck
- Full exterior paint job
- Cushion covers replaced
- Main deck table
- Main deck seating
- Owners deck seating
- Sun deck seating
- New Perspex on sun deck
- Jacuzzi on sun deck replaced
- Sun deck bar area and table tops replaced
- Teak decks sanded
- Capping rails stripped and refinished
Interior
- New Galley flooring
- Galley painted
- New refrigeration compressor area in bosun store rebuilt
- New carpet in lower guest
- Refinished main deck and dining room flooring
- Laundry room flooring replaced
- Air handlers in Master replaced
- Marble polished
- All ducts cleaned
- A/C System
Engineering
- New H&H chiller installed
- New chilled water loops installed
- New fuel tank sensors installed
- Fresh water tanks repaired and coated
- Quantum Stabiliser Served
Bridge
- Night vision camera replaced
- New Raymarine plotter
- New mast search lights
- New mast antennas
Hull
- Antifouling
- New zinc anodes
- True-hull valves inspected & sea chest
- Rudders removed and re-installed
- Inspection of shafts, seals and bearings
- Shafts removed and inspected
- Hull Plating and stern tubes
Safety
- Outboard Harken track replaced
AVIT
- Upgraded movie server & Av hardware
- New exterior speakers
2020/2021
Deck
- Hull repainted
- New ice machine on sun deck
- New sun deck awning
- Replaced glass paneling of main deck and owner’s deck sliding doors
Interior
- Crew mess flooring replaced
- Replaced crew mess table top
- Varnished bridge floor
- Replaced all interior lights with LEDS
- New crew mess dishwasher
- All interior door handles replaced
- Replaced guest bathroom tapware
Engineering
- New Generators
- New Engines
- Tank inspection, cleaning and repainted
- Gearbox servicing
- New water softener installed
- Majority of guest accommodation pipework replaced
- New fire detection system
- Paint engine room bilges
- MTU Go system installed
- Pipework
Hull
- Shaft removal, replaced bearings and shaft seals
- Pressure washed and antifouling applied
Spring/Summer 2024
Engineering
• Incline test completed
• Tanks blast & coat
• Shafts removal and inspection
• Port & Stb stern tube renewed
• Cutlas bearings renewed
• Chloride remover wash & brush blast Grey Water Holding Tank
• Propulsion Equipment Alignment
• Anchor Gear Renewed
• Anchor Chain Thickness Measurement
• Rudders removal and inspection
• Anchor Inspection
• Sand and Coat Stb and Port Rudder Tubes
• Overboard Valve Removal and Replacement
• Overboard Vale Service
• Tank recoating and Touch ups
• Bow Thruster Service
• Engine Room Fire Dampers Replacement
• ER Pipework Clean – Removal and Inspection
Hull
• Yacht hauled out and bottom was inspected
• Bottom was prepped and painted
• Anodes replaced
Deck
• Paint touch ups around various parts of the exterior on high visible areas
DISCLAIMER
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.
TENDER & TOYS
• 1 x Sea-Doo 2020 GTX 230 HP
• Novurania Launch 650 (6.5m)
• Neuvisa Rescue Boat (4.19m)
Note: Subject to change and/or negotiation during the buying process.